CPT Engineering was engaged to fabricate the spray mitigation structure for Hydro Tasmania at the Cethana Power Station. The structure is designed to protect the road from spray when the adjacent dam is spilling. This project produced some interesting challenges for design and fabrication as one side of the structure was attached to an irregular rock face. The process from design drawings to workshop drawings to fabrication and finally to erection went extremely smoothly with everything bolting together nicely. A credit to CPT’s staff.

Robert Johnston,
Project Manager, Pitt and Sherry.